PORTFOLIO / PROJECT 08

Focused office coverage

2 APs · 1 layout · Predictive design

The design challenge

Two APs serve a single modeled office floor. The compact footprint makes AP placement and coverage boundaries especially important.

Engineering considerations

Review both AP positions against the office area and the intervening walls. Small projects deserve more than a small amount of thought.

2 × CW9176I. Blue: CW9176I. Orange: CW9176D1.

Focused office coverage: layout 1, colored AP positions and LEET AP labels
Layout 1 · 2 APs · 5 GHz signal strength · Open map

5 GHz predicted signal strength from the design report, with AP positions and model colors. On-site validation checks installed performance.

← All projects