PORTFOLIO / PROJECT 07

A small office, deliberately designed

3 APs · 1 layout · Predictive design

The design challenge

Three APs serve two modeled office coverage areas. A small AP count still calls for careful review of room boundaries and overlap.

Engineering considerations

Start with the occupied areas and the walls between them. Keep the placement proportional to the requirement; more APs is not a design method.

3 × CW9176I. Blue: CW9176I. Orange: CW9176D1.

A small office, deliberately designed: layout 1, colored AP positions and LEET AP labels
Layout 1 · 3 APs · 5 GHz signal strength · Open map

5 GHz predicted signal strength from the design report, with AP positions and model colors. On-site validation checks installed performance.

← All projects