PORTFOLIO / PROJECT 06

A sheet-metal workshop

4 APs · 1 layout · Predictive design

The design challenge

Four APs serve a floor modeled with warehouse coverage requirements. The workshop context makes the physical environment an essential part of the review.

Engineering considerations

Check the modeled partitions and AP spacing, then confirm material and equipment assumptions during fieldwork. Metal has opinions about RF.

4 × CW9176I. Blue: CW9176I. Orange: CW9176D1.

A sheet-metal workshop: layout 1, colored AP positions and LEET AP labels
Layout 1 · 4 APs · 5 GHz signal strength · Open map

5 GHz predicted signal strength from the design report, with AP positions and model colors. On-site validation checks installed performance.

← All projects