PORTFOLIO / PROJECT 06
A sheet-metal workshop
4 APs · 1 layout · Predictive design
The design challenge
Four APs serve a floor modeled with warehouse coverage requirements. The workshop context makes the physical environment an essential part of the review.
Engineering considerations
Check the modeled partitions and AP spacing, then confirm material and equipment assumptions during fieldwork. Metal has opinions about RF.
4 × CW9176I. Blue: CW9176I. Orange: CW9176D1.
5 GHz predicted signal strength from the design report, with AP positions and model colors. On-site validation checks installed performance.