PORTFOLIO / PROJECT 04

Training and office spaces

11 APs · 2 layouts · Predictive design

The design challenge

An eleven-AP design spans two floors in a professional development center. Coverage planning has to account for both the rooms and the distribution of users.

Engineering considerations

Review individual learning and work areas, then check capacity assumptions and adjacent cells. Full signal bars do not grade the assignment.

11 × CW9176I. Blue: CW9176I. Orange: CW9176D1.

Training and office spaces: layout 1, colored AP positions and LEET AP labels
Layout 1 · 6 APs · 5 GHz signal strength · Open map
Training and office spaces: layout 2, colored AP positions and LEET AP labels
Layout 2 · 5 APs · 5 GHz signal strength · Open map

5 GHz predicted signal strength from the design report, with AP positions and model colors. On-site validation checks installed performance.

← All projects